How many panels are sitting half built, waiting for something?
Which panels are held and why. Which fault keeps appearing at testing. Whether the man building it has the latest drawing.
Three manufacturers. Each one started building before the kit was actually complete.
A panel needs several hundred items. Wiring starts when the kit looks complete.
Two contactors are missing. Nobody knows until the wireman reaches them, by which point the panel is half built and cannot be closed, so it occupies a bay and waits.
The kit is checked against the bill of materials as a stage, before the bay is occupied.
Every panel is tested. Faults are found and corrected, and the panel ships.
But nobody records which fault, on whose build, so the same wiring error recurs across panels and across months without anybody seeing it as a pattern rather than as an incident.
Each fault is recorded against the panel, the stage and the person who built it.
Panel drawings change during the job. That is normal — the customer clarifies something, a component becomes unavailable.
The change reaches the site engineer and the project manager. It does not always reach the man with the crimping tool, and he is the one building it.
The current drawing sits on the panel job, visible to the person at that stage, with the revision on screen.
A panel does not fail at testing. It fails at kitting, and finds out at testing.
Every panel. Every component. Every test tracked.
This is how a print job moves through your business. Clicarity gives you live visibility at every phase — and flags delays before they become client calls.
What improves in electrical panel businesses using Clicarity
Questions from electrical panels businesses
See every panel. Every stage. Before the test fails.
Book a free demo. We'll map your panel manufacturing workflow live on the call.