Clicarity Electrical Panels
⚡ Industry · Electrical Panel Manufacturing

How many panels are sitting half built, waiting for something?

Which panels are held and why. Which fault keeps appearing at testing. Whether the man building it has the latest drawing.

One manufacturer found twenty-three panels a month occupying bays half built. Eleven were waiting on components that were short at kitting.
Electrical panel manufacturers — assembly and testing visibility live
As featured in PrintWeek India, April 2026 ↗

Three manufacturers. Each one started building before the kit was actually complete.

01 The kit that was never complete

A panel needs several hundred items. Wiring starts when the kit looks complete.

Two contactors are missing. Nobody knows until the wireman reaches them, by which point the panel is half built and cannot be closed, so it occupies a bay and waits.

Panels held mid-build, one month — why
Component short11 panels
Wrong rating supplied4 panels
Drawing query5 panels
Awaiting customer input3 panels

The kit is checked against the bill of materials as a stage, before the bay is occupied.

23 panels → 7held mid-build
Show me howFifteen minutes. We look at one panel.
02 Faults found at testing

Every panel is tested. Faults are found and corrected, and the panel ships.

But nobody records which fault, on whose build, so the same wiring error recurs across panels and across months without anybody seeing it as a pattern rather than as an incident.

Test faults by type, one quarter
Wiring to wrong terminal34 faults
Torque not done14 faults
Component wrong rating9 faults
Labelling7 faults

Each fault is recorded against the panel, the stage and the person who built it.

64 faults → 21next quarter
Find out howBring last quarter. Fifteen minutes.
03 The drawing that changed

Panel drawings change during the job. That is normal — the customer clarifies something, a component becomes unavailable.

The change reaches the site engineer and the project manager. It does not always reach the man with the crimping tool, and he is the one building it.

Rework by root cause, one quarter
Built to old drawing9 panels
Wiring error5 panels
Wrong component fitted3 panels

The current drawing sits on the panel job, visible to the person at that stage, with the revision on screen.

9 panels → 1rework from old drawings
Show me howFifteen minutes. We attach one drawing.

A panel does not fail at testing. It fails at kitting, and finds out at testing.

Every panel. Every component. Every test tracked.

This is how a print job moves through your business. Clicarity gives you live visibility at every phase — and flags delays before they become client calls.

01
Order & Engineering
4 stages
Order Received
Customer order confirmed — panel type, rating, specifications, delivery date.
✓ Clicarity: Job ID created, engineering design initiated
Schematic / GA Drawing
Schematic and general arrangement drawing prepared and approved.
⚠ ⚠ Common delay: drawing revisions — BOM cannot be finalised until drawing approved
BOM Preparation
Bill of materials prepared from approved drawing.
✓ Clicarity: BOM logged — procurement triggered automatically
Drawing Issue to Shop
Approved drawing issued to panel shop for fabrication.
✓ Clicarity: Drawing revision locked — shop works only on approved version
02
Procurement
3 stages
Component Procurement
Breakers, busbars, contactors, meters, and enclosures procured.
⚠ ⚠ Common delay: one component late — entire assembly held
Incoming Inspection
Electrical components verified against BOM specifications.
✓ Clicarity: Component receipt logged — kitting cannot start until all items cleared
Kit Issue to Assembly
Complete kit issued to assembly engineer.
✓ Clicarity: Kit confirmation logged — assembly stage initiated
03
Fabrication & Assembly
5 stages
Enclosure Fabrication
Panel enclosure cut, drilled, and prepared for assembly.
Busbar Fabrication
Busbars cut, drilled, and bent per drawing.
⚠ ⚠ Common delay: busbar wrong size — re-fabrication required
Component Mounting
All components mounted on DIN rail or panel as per layout.
✓ Clicarity: Engineer assigned — accountability per stage
Wiring & Termination
All wiring done per schematic — ferrules, lugs, and terminations.
⚠ ⚠ Common delay: wiring errors found only at testing — rework adds days
Internal Inspection
Wiring checked against schematic before testing begins.
✓ Clicarity: Inspection sign-off mandatory — testing cannot start without it
04
Testing & Dispatch
3 stages
Testing
Panel powered and tested — insulation, continuity, functional.
✓ Clicarity: Test result logged — pass/fail tracked by engineer and job
Final Inspection / FAT
Factory acceptance test conducted with customer or inspector.
⚠ ⚠ Common delay: customer not available for FAT — dispatch held
Dispatch
Panel dispatched with test certificates and drawings.
✓ Clicarity: Full panel history from BOM to dispatch preserved
""Testing always revealed problems that should have been caught at wiring. We had no way to track which engineer had wired which panel. Now every stage has a name against it — accountability changed everything.""
PR
Production Head
Electrical Panel Manufacturer — Nashik, Maharashtra
As featured in PrintWeek India, April 2026 — Vol 18, Issue 12 ↗ Also in Print Bulletin, May 2026 — Pages 20–21 ↗

What improves in electrical panel businesses using Clicarity

↓ 60%
Testing failures from wiring errors
↑ 38%
On-time dispatch improvement
↓ 50%
BOM-related assembly holds
5 days
To go live — full setup included

Questions from electrical panels businesses

How does Clicarity work for a printing business specifically?
Clicarity is configured around your specific print workflow — pre-press, printing, finishing, dispatch — in your terminology. Every job gets a unique ID and moves through your defined stages. You see live status, timestamps, and alerts when a job sits too long at every stage. The Clicarity team builds everything for you. You go live in 5 days.
Does it work for both offset and digital printing?
Yes. Clicarity works for any print process — offset, digital, wide format, screen printing, or a combination. The stages are configured around your actual workflow. If offset jobs go through plate making and digital jobs skip that stage, both can be tracked correctly under the same system.
Can it track material wastage at each stage?
Yes — with the Multi Licence. At every stage, your team logs quantity in and quantity out. Clicarity calculates the loss automatically. You see wastage by stage, by job, live — not at month-end when nothing can be done about it.
Will my press operators actually use it?
Yes. The update screen has two fields — Job ID and status. Under a minute. No training needed. GP Offset's entire team was using it from day one, including floor workers who had never used a software system before.

See every panel. Every stage. Before the test fails.

Book a free demo. We'll map your panel manufacturing workflow live on the call.

No commitment Live in 5 days Annual licence Full setup included