Which coil did that go from — and how long to prove it?

Which line is really losing your yield. How long a trace actually takes. How many orders are sitting blocked on a single width.

One processor took six hours to trace a customer complaint back to its heat number. The record existed. It was in four different books.
Steel processing plants — coil and order visibility live
As featured in PrintWeek India, April 2026 ↗

Three processors. Each one had the record and could not find it.

01 The coil nobody could find

A coil arrives, gets a number, goes into the yard. Then it is slit, and the children coils get their own identity, and the link back to the parent is a line in somebody's book.

When a customer questions a property, tracing which coil it came from takes a day of walking and asking — if it can be traced at all.

Time to trace one coil back to its heat number
With records in a book6 hrs
With a spreadsheet2.5 hrs
Tracked at each cut4 min

Every child coil now carries its parent and its heat number automatically, at the moment of slitting.

6 hrs → minutesto trace any coil
Show me howFifteen minutes. We trace one live.
02 Yield, and where it actually goes

You know your overall yield. Everybody does. What almost nobody knows is which line, which operator, which coil width is pulling it down.

Scrap is weighed at the end. By then it is one number for the month and there is nothing to act on.

Scrap by line, one month
Slitter 11.8%
Slitter 22.4%
Cut-to-length7.1%
Shearing1.4%

Input weight and output weight are recorded at every operation, so the gap has a line attached to it.

7.1% → 3.2%on the line that was losing most
Find out howBring last month. Fifteen minutes.
03 The order waiting on one width

A customer order needs four widths. Three are cut. The fourth is waiting because the right coil was not planned in.

The order sits complete-but-not-dispatchable, and nobody sees it as blocked because three of four lines show finished.

Orders held, and by how many items
Waiting on 1 item18 orders
Waiting on 2 items7 orders
Waiting on 3 or more3 orders

An order now shows as blocked when any part of it is, not complete when most of it is.

18 orders → 5held on a single item
Show me howFifteen minutes. Bring one order.

The steel was never the problem. Knowing which steel, and when, was.

Every coil. Every order. Every operation tracked.

This is how a print job moves through your business. Clicarity gives you live visibility at every phase — and flags delays before they become client calls.

01
Order & Coil Planning
4 stages
Order Received
Customer order confirmed — grade, thickness, width, length, quantity, delivery.
✓ Clicarity: Job ID created, coil allocated, machine scheduled
Coil Procurement
Mother coil procured from steel mill with MTC per order spec.
⚠ ⚠ Common delay: wrong grade or thickness received — order held
Incoming Inspection
Coil tested for mechanical properties, surface quality, and dimensions.
✓ Clicarity: Heat number and MTC recorded — full coil traceability begins
Production Scheduling
Orders scheduled on processing lines by priority and delivery date.
✓ Clicarity: Machine queue visible — overload flagged before commitment
02
Primary Processing
4 stages
Pickling / Decoiling
HR coil pickled to remove scale; coil decoiled for processing.
⚠ ⚠ Common delay: pickling acid concentration off — surface quality affected
Slitting
Coil slit to required width on slitting machine.
✓ Clicarity: Slit coil weight and width logged — trim waste tracked
Levelling / Straightening
Material levelled to required flatness tolerance.
Shearing / Cut to Length
Material sheared to required sheet or plate length.
✓ Clicarity: Sheet count vs order quantity tracked — shortfall visible live
03
Secondary Processing
3 stages
Blanking / Stamping
Blanks or shapes stamped from sheet where required.
✓ Clicarity: Blank count and scrap percentage tracked per run
Surface Treatment
Oiling, galvanising, or coating applied where specified.
⚠ ⚠ Common delay: surface treatment vendor late — dispatch held
Edge Trimming / Deburring
Edges trimmed and deburred per customer requirement.
04
QC & Dispatch
3 stages
Quality Inspection
Material inspected for dimensions, surface, and mechanical properties.
✓ Clicarity: Rejection rate by grade and operation tracked
Packing & Weighment
Material packed, bundled, and weighed for dispatch.
✓ Clicarity: Dispatched weight vs order weight confirmed
Dispatch
Order dispatched with MTC, test certificate, and challan.
✓ Clicarity: Full coil traceability from mother coil to customer delivery
""We used to promise delivery dates without knowing the real machine queue. Now I see pending tonnage per machine before committing to any customer. Late deliveries dropped from 28% to 6% in two months.""
OP
Operations Head
Steel Service Centre — Pune, Maharashtra
As featured in PrintWeek India, April 2026 — Vol 18, Issue 12 ↗ Also in Print Bulletin, May 2026 — Pages 20–21 ↗

What improves in steel processing businesses using Clicarity

↓ 65%
Late delivery incidents
↑ 40%
Machine utilisation improvement
↓ 35%
Coil wastage reduction
5 days
To go live — full setup included

Questions from steel processing businesses

How does Clicarity work for a printing business specifically?
Clicarity is configured around your specific print workflow — pre-press, printing, finishing, dispatch — in your terminology. Every job gets a unique ID and moves through your defined stages. You see live status, timestamps, and alerts when a job sits too long at every stage. The Clicarity team builds everything for you. You go live in 5 days.
Does it work for both offset and digital printing?
Yes. Clicarity works for any print process — offset, digital, wide format, screen printing, or a combination. The stages are configured around your actual workflow. If offset jobs go through plate making and digital jobs skip that stage, both can be tracked correctly under the same system.
Can it track material wastage at each stage?
Yes — with the Multi Licence. At every stage, your team logs quantity in and quantity out. Clicarity calculates the loss automatically. You see wastage by stage, by job, live — not at month-end when nothing can be done about it.
Will my press operators actually use it?
Yes. The update screen has two fields — Job ID and status. Under a minute. No training needed. GP Offset's entire team was using it from day one, including floor workers who had never used a software system before.

See every coil. Every machine. Before the delivery date is missed.