Clicarity Industrial Projects
🏭 Industry · Industrial EPC & Projects

Your project is running.
But which package is behind schedule and why?

From project kick-off to commissioning — live visibility across every industrial project phase. Track engineering deliverables, procurement status, fabrication progress, and site milestones without weekly status meetings.

Industrial EPC companies — project milestone visibility live
As featured in PrintWeek India, April 2026

Every package. Every milestone. Every delay visible.

This is how a print job moves through your business. Clicarity gives you live visibility at every phase — and flags delays before they become client calls.

01
Project Initiation
4 stages
Contract Award
Project contract signed, scope and milestones confirmed.
✓ Clicarity: Project ID created, work packages defined, owners assigned
Project Kick-Off
Kick-off meeting held, project plan baselined, communication protocols set.
Work Breakdown Structure
Project broken into work packages — engineering, procurement, civil, mechanical, electrical.
✓ Clicarity: Each package tracked independently — status visible at package level
Engineering Start
Detailed engineering commenced — process, civil, mechanical, electrical drawings.
⚠ ⚠ Common delay: client inputs delayed — engineering cannot start without approved BFDs
02
Engineering
4 stages
Process / Basic Engineering
Process flow diagrams, P&IDs, and equipment datasheets issued.
✓ Clicarity: Document issue status tracked — procurement cannot start without approved docs
Detailed Engineering
Civil, structural, piping, electrical, and instrumentation drawings issued.
⚠ ⚠ Common delay: drawing revisions — fabrication and procurement hold pending
Vendor Document Review
Vendor drawings and data sheets reviewed and approved.
⚠ ⚠ Common delay: review cycle takes weeks — equipment delivery delayed
As-Built Documentation
As-built drawings updated through construction for handover package.
✓ Clicarity: As-built completion tracked per system — handover cannot proceed without
03
Procurement
4 stages
Inquiry & Tender
RFQs issued to vendors, technical and commercial bids received.
✓ Clicarity: Inquiry and bid receipt status tracked per package
Technical & Commercial Evaluation
Bids evaluated, technical clarifications resolved.
⚠ ⚠ Common delay: evaluation taking longer than planned — order placement delayed
Purchase Order Placement
POs placed with approved vendors per budget.
✓ Clicarity: PO date and delivery commitment logged — delivery tracking begins
Expediting & Delivery
Vendor progress expedited — factory inspection, shipping, and delivery tracked.
⚠ ⚠ Common delay: equipment delivery late — site readiness wasted, critical path impacted
04
Construction
4 stages
Civil & Foundation
Civil works and equipment foundations completed.
✓ Clicarity: Civil completion by area tracked — equipment erection can begin
Equipment Erection
Major equipment erected and aligned per drawings.
⚠ ⚠ Common delay: equipment not delivered — civil complete but erection cannot start
Piping & Mechanical
Piping, ductwork, and mechanical systems installed and tested.
✓ Clicarity: System-wise completion tracked — hydrotest status visible per line
Electrical & Instrumentation
Electrical cabling, panels, and instrumentation installed and tested.
✓ Clicarity: Loop test completion tracked — commissioning cannot start without clearance
05
Commissioning & Handover
3 stages
Pre-Commissioning
Equipment flushing, loop checks, and dry runs completed.
✓ Clicarity: Pre-commissioning punch list tracked — open items visible live
Commissioning
Plant commissioned and performance tested at rated conditions.
✓ Clicarity: Performance test results logged — handover blocked until pass
Project Handover
Handover documentation, training, and as-builts transferred to client.
✓ Clicarity: Full project history — engineering to commissioning — preserved

Real bottlenecks. Real costs. Real fixes.

These are the patterns Clicarity helps businesses identify and fix within the first few weeks.

Equipment Delivery
Critical pump delivered 6 weeks late — civil complete and idle for 6 weeks
An expediting log was maintained in spreadsheets with no visibility to the project team. A critical pump delivery slipped 6 weeks — nobody escalated because the delay was not visible at the project level. Civil was complete and the erection crew was idle. With Clicarity, each equipment delivery has a status and a flag date. Escalation triggered at week 2.
Equipment delivery escalated at week 2 — not week 6
Drawing Revision
Fabrication done to superseded drawing — ₹4.2L rework
A structural fabricator used a drawing that had been superseded by a revision issued the previous day. Fabrication was 60% complete when the error was found. Rework cost: ₹4.2L. With Clicarity, drawing revision is a tracked stage — fabricators see only the current approved drawing. Revision-related rework: eliminated.
₹4.2L revision rework prevented — drawing control enforced
Status Meetings
3-hour weekly project review replaced by 20-minute exception review
A project team was spending 3 hours every week in status meetings — each package manager reporting individually. Most of the meeting covered items that were on track. With Clicarity, the project director sees all package statuses before the meeting. Meetings now focus only on flagged items. Meeting time reduced from 3 hours to 20 minutes.
Weekly meeting reduced from 3 hours to 20 minutes
""We had 14 open procurement packages and I could not tell you which ones were at risk of delaying the critical path. Now I see every package status at 8 AM and I know exactly what needs escalation today.""
PR
Project Director
Industrial EPC Company — Mumbai
As featured in PrintWeek India, April 2026 — Vol 18, Issue 12 ↗

What improves in industrial project businesses using Clicarity

↓ 40%
Project milestone overruns
↑ 35%
On-time commissioning rate
↓ 60%
Weekly status meeting time
5 days
To go live — full setup included

One licence. Your entire operation.

No per-user fees. Full setup by the Clicarity team. Live in 5 days.

Single Licence
₹30,000
/ year
1 user · Annual licence
₹82 a day. Less than a daily meal for one person — for your entire team's visibility, all year.
Get a Quote
Multi Licence
₹55,000
/ year
Unlimited users · Annual licence
₹150 a day. Less than the cost of one missed delivery — for full visibility across your entire team.
Get a Quote
Annual billing · No hidden fees · Full setup included · Go live in 5 days

Questions from industrial projects businesses

How does Clicarity work for a printing business specifically?
Clicarity is configured around your specific print workflow — pre-press, printing, finishing, dispatch — in your terminology. Every job gets a unique ID and moves through your defined stages. You see live status, timestamps, and bottleneck alerts at every stage. The Clicarity team builds everything for you. You go live in 5 days.
Does it work for both offset and digital printing?
Yes. Clicarity works for any print process — offset, digital, wide format, screen printing, or a combination. The stages are configured around your actual workflow. If offset jobs go through plate making and digital jobs skip that stage, both can be tracked correctly under the same system.
Can it track material wastage at each stage?
Yes — with the Multi Licence. At every stage, your team logs quantity in and quantity out. Clicarity calculates the loss automatically. You see wastage by stage, by job, live — not at month-end when nothing can be done about it.
Will my press operators actually use it?
Yes. The update screen has two fields — Job ID and status. Under a minute. No training needed. GP Offset's entire team was using it from day one, including floor workers who had never used a software system before.

See every package. Every milestone. Before it hits the critical path.

Book a free demo. We'll map your project workflow live on the call.

No commitment Live in 5 days Annual licence Full setup included