Products / Engineering and Projects

Drawing and Revision Control

Engineering document management

The right revision of every drawing, and proof of who approved it.

The right revision of every drawing, at the machine and with the vendor.

  1. A customer sends a revised drawing.

    It enters as a new revision. The old one is marked superseded, not deleted.

  2. It is checked and approved.

    Only the released revision is visible to production and to vendors.

  3. A part is questioned.

    You see which revision it was made to, and who approved it.

Simple.

One list of every drawing, at its current revision.

Customisable.

Your numbering, your approval steps and your revision rules.

Anyone can update.

Design updates it. Production and vendors only ever see what is released.

What you see, at any moment.

  • Every drawing and its released revision
  • Revisions waiting to be checked or approved
  • Superseded revisions, kept for the record
  • Who approved each revision

One workflow. Unlimited users.

Drawing and Revision Control counts as one workflow. The Standard plan includes 3, so you can run it with two more products in the same plan.

See pricing
Unlimited usersYour own stagesYour own forms

Work done on the current revision, the number this moves

See it with your own stages.

Tell us your steps on a short call. We set it up around them and show it to you working.

© 2026 Clicarity