🏗️ Industry · Construction & Contracting
Your site is running.
But which phase is stuck — and since when?
From design approval to handover — live visibility across every construction phase. Track vendor delays, material arrivals, sub-contractor progress, and payment milestones on one screen.
Construction businesses — project phase visibility live
As featured in PrintWeek India, April 2026
Your Production Flow
Every phase. Every vendor delay. Every milestone tracked.
This is how a print job moves through your business. Clicarity gives you live visibility at every phase — and flags delays before they become client calls.
01
Pre-Construction
5 stages
Client Brief & Scope
Project scope, budget, and timeline confirmed with client.
✓ Clicarity: Project ID created, all scope documents attached
Design & Drawings
Architectural and structural drawings prepared and approved.
⚠ ⚠ Common delay: design revisions with no deadline — site start pushed
Regulatory Approvals
Building permits, NOCs, and local body approvals obtained.
⚠ ⚠ Common delay: approval bodies take weeks — tracked but status invisible daily
BOQ & Estimation
Bill of quantities prepared and contractor estimates received.
Vendor & Sub-Contractor Finalisation
All sub-contractors and material vendors confirmed and onboarded.
✓ Clicarity: Each vendor assigned their scope — they update their own stages
02
Site Preparation & Foundation
4 stages
Site Clearance & Levelling
Site cleared, graded, and prepared for construction.
Excavation
Foundation excavation to required depth and dimensions.
⚠ ⚠ Common delay: underground utilities or rock — programme disrupted
Foundation & Footings
Foundation laid per structural drawing — PCC, reinforcement, and concrete.
✓ Clicarity: Concrete pour date logged — curing time tracked automatically
Plinth & Basement
Plinth beam, basement walls, or raft foundation completed.
✓ Clicarity: Stage completion logged, next phase notified automatically
03
Superstructure & Civil Work
5 stages
Column & Beam Construction
RCC columns and beams poured floor by floor.
✓ Clicarity: Floor-wise progress tracked — bottleneck floors flagged
Slab Construction
Floor slabs poured with reinforcement as per drawing.
⚠ ⚠ Common delay: formwork shortage — next slab delayed while previous cures
Brick / Block Masonry
Walls constructed per floor plan after slab completion.
⚠ ⚠ Common delay: masonry contractor stalls — next trades cannot start
Plastering
Internal and external plaster applied to masonry walls.
Waterproofing
Waterproofing applied to wet areas, terrace, and basement.
✓ Clicarity: Waterproofing stage logged — cannot proceed to flooring without it
04
MEP & Finishing
5 stages
Electrical Rough-In
Conduits, junction boxes, and wiring laid before plastering or flooring.
⚠ ⚠ Common delay: electrical contractor arrives after plaster — remedial work required
Plumbing Rough-In
Pipe runs and plumbing fixtures roughed in before finishing.
⚠ ⚠ Common delay: plumbing and civil not coordinated — phases clash
HVAC / Ducting
Air conditioning and ventilation ducts installed.
Flooring & Tiling
Tiles, marble, or wooden flooring laid after sub-floor preparation.
✓ Clicarity: Room-wise or floor-wise progress tracked
Painting & Finishing
Wall putty, primer, and final paint applied.
✓ Clicarity: Painter productivity visible — slow areas flagged before handover deadline
05
Handover & Closeout
3 stages
Snagging / Punch List
Final inspection — all defects, incomplete items, and snags listed.
✓ Clicarity: Every snag item tracked with responsible party and resolution date
Snag Clearance
All punch list items completed and re-inspected.
⚠ ⚠ Common delay: sub-contractors slow to clear snags — handover delayed
Handover & Documentation
Keys, warranties, as-built drawings, and compliance certificates handed to client.
✓ Clicarity: Full project history from design to handover preserved
Where Construction Businesses Lose Time & Money
Real bottlenecks. Real costs. Real fixes.
These are the patterns Clicarity helps construction businesses identify and fix within the first few weeks.
Masonry Stall
Masonry contractor stalled for 8 days — tiling team arrived and had to leave
A contracting firm tracked phase completion for each floor. The masonry contractor on floor 3 had stalled for 8 days — but nobody escalated it because each trade assumed someone else was tracking. The tiling team arrived, couldn't start, and charged for the wasted mobilisation. With Clicarity, the stall was visible on day 2. Cost saving: approximately ₹1.8L in trade mobilisation waste.
Trade clash avoided — ₹1.8L mobilisation waste prevented
Electrical Coordination
Electrical rough-in missed before plastering — cost ₹3.2L in remedial work
A builder found that electrical conduits had not been laid before plaster was applied on two floors. The electrician claimed they were not notified. The plaster contractor claimed they were never told to wait. Breaking open plastered walls for conduit runs cost ₹3.2L. With Clicarity, electrical rough-in is a mandatory stage before plaster proceeds. This sequence is enforced — not assumed.
Stage sequence enforced — ₹3.2L remedial work prevented
Snag Clearance
Handover delayed 6 weeks because sub-contractors ignored punch list
A contracting firm had a project ready for handover but 47 snag items remained uncleared 4 weeks after the punch list was issued. Each sub-contractor claimed their items were done — until asked for proof. With Clicarity, every snag item is assigned to a responsible party with a completion date. Status visible live. Sub-contractor accountability improved and handover happened 5 weeks earlier on the next project.
Handover achieved 5 weeks earlier on next project
Real Printing Business. Real Results.
""We used to discover that a sub-contractor had stalled only when the next trade couldn't start. By then we'd lost a week. Now I see stalled phases on my phone before they impact the programme.""
What improves in construction businesses using Clicarity
↓ 40%
Project delays from phase dependencies
↑ 35%
On-time milestone completion
↓ 70%
Sub-contractor follow-up calls
5 days
To go live — full setup included
One licence. Every project. Every phase visible.
No per-user fees. Full setup by the Clicarity team. Live in 5 days.
Single Licence
₹30,000
/ year
1 user · Annual licence
₹82 a day. Less than a daily meal for one person — for your entire team's visibility, all year.
Get a Quote
Multi Licence
₹55,000
/ year
Unlimited users · Annual licence
₹150 a day. Less than the cost of one missed delivery — for full visibility across your entire team.
Get a Quote
Annual billing · No hidden fees · Full setup included · Go live in 5 days
Questions from construction businesses
How does Clicarity work for a printing business specifically?
Clicarity is configured around your specific print workflow — pre-press, printing, finishing, dispatch — in your terminology. Every job gets a unique ID and moves through your defined stages. You see live status, timestamps, and bottleneck alerts at every stage. The Clicarity team builds everything for you. You go live in 5 days.
Does it work for both offset and digital printing?
Yes. Clicarity works for any print process — offset, digital, wide format, screen printing, or a combination. The stages are configured around your actual workflow. If offset jobs go through plate making and digital jobs skip that stage, both can be tracked correctly under the same system.
Can it track material wastage at each stage?
Yes — with the Multi Licence. At every stage, your team logs quantity in and quantity out. Clicarity calculates the loss automatically. You see wastage by stage, by job, live — not at month-end when nothing can be done about it.
Will my press operators actually use it?
Yes. The update screen has two fields — Job ID and status. Under a minute. No training needed. GP Offset's entire team was using it from day one, including floor workers who had never used a software system before.
See every phase. Every vendor. Before the delay compounds.
Book a free demo. We'll map your construction workflow live on the call.
No commitment
Live in 5 days
Annual licence
Full setup included